BUSINESS
Compute Infrastructure: Business Value & Strategic Analysis
Executive business case for compute infrastructure investment and optimization.
Executive Summary
Strategic Opportunity
Modern compute infrastructure (cloud, virtualization, containers) enables organizations to:
- Reduce infrastructure costs by 50-70% through consolidation and cloud adoption
- Accelerate time-to-market from weeks to days through elastic scaling
- Improve reliability to 99.99% uptime with multi-AZ, multi-region deployment
- Enable innovation by freeing teams from infrastructure management
Key Business Metrics
| Metric | Impact | Benefit |
|---|---|---|
| Infrastructure Cost | $100K/month → $35K/month | 65% reduction |
| Deployment Time | 1-2 weeks → 1-2 hours | 50x faster |
| System Uptime | 99% → 99.99% | 10x improvement |
| Team Productivity | 50% ops overhead → 10% | 4 FTE freed |
| Feature Delivery | Quarterly → Weekly | 13x faster |
| Incident Recovery | 4-8 hours → 10 minutes | 24-48x faster |
Financial Summary (Year 1)
| Category | Calculation | Amount |
|---|---|---|
| Current Infrastructure Cost | On-premise datacenter | ($1,200,000) |
| Cloud Optimization | Right-sizing, reserved instances | $780,000 |
| Reduced Incidents | Fewer outages, better availability | $300,000 |
| Operational Efficiency | 4 FTE from ops to innovation | $600,000 |
| Accelerated Revenue | Faster feature delivery | $500,000 |
| Implementation Cost | Migration, training, tools | ($350,000) |
| Year 1 Net Benefit | $1,830,000 | |
| Year 1 ROI | ($1.83M / $350K) | 523% |
| Payback Period | 2.3 months |
Bottom Line: $1.83M annual benefit, 523% Year 1 ROI, payback in 2.3 months
1. Current State Analysis
On-Premise Infrastructure Pain Points
Current Situation:
Infrastructure Costs (Annual):
├─ Datacenter rent: $400K/year
├─ Hardware (5-year amortization): $300K/year
├─ Power & cooling: $150K/year
├─ Networking infrastructure: $100K/year
├─ Maintenance & support: $150K/year
├─ Staff (5 FTE ops): $750K/year
├─ Security & compliance: $100K/year
└─ Total: $1,950K/year
Operational Challenges:
├─ Slow deployment (1-2 weeks for new capacity)
├─ Over-provisioning: 30-40% unused capacity at all times
├─ Fixed costs: Must pay for infrastructure whether used or not
├─ Scaling limitations: Physical expansion takes months
├─ Disaster recovery: Requires secondary datacenter ($400K+)
├─ Staff burnout: 60% of time on reactive ops, 40% on maintenance
└─ Technology debt: Systems 3-5 years old, difficult to upgrade
Business Impact:
├─ New features delayed 2-3 weeks waiting for hardware
├─ Competitor launches similar features first
├─ Customer complaints: "Why are we slower than <competitor>?"
├─ Team retention: Operations staff leaving for "interesting" jobs
├─ Risk exposure: No geographic redundancy, single point of failure
└─ Estimated lost revenue: $200K-500K annually
Benchmarking vs. Cloud-Native Competitors
Metric Your Company Cloud-Native Competitor
─────────────────────────────────────────────────────────
Infrastructure cost $1.95M/year $700K/year (64% lower)
Deployment time 1-2 weeks 1-2 hours (50x faster)
Feature velocity Quarterly Weekly (13x faster)
Uptime SLA 99% 99.99% (10x better)
Disaster recovery Secondary DC Multi-region (automatic)
Time to scale 4-6 weeks 5-10 minutes (automatic)
Operations team 60% overhead 20% overhead (3 FTE freed)
2. Compute Infrastructure Solutions
Cloud-First Architecture
Migration Path:
Phase 1: Pilot (Month 1-2)
├─ Select 2-3 non-critical applications
├─ Migrate to AWS/Azure/GCP
├─ Validate costs and performance
├─ Build team expertise
Phase 2: Core Services (Month 3-6)
├─ Migrate production database tier
├─ Implement auto-scaling
├─ Set up monitoring and alerting
├─ Establish runbooks and procedures
Phase 3: Full Migration (Month 6-12)
├─ Migrate remaining legacy applications
├─ Implement containerization (Docker/Kubernetes)
├─ Decommission on-premise infrastructure
├─ Release 50% of ops team to innovation
Phase 4: Optimization (Month 12+)
├─ Continuous cost optimization
├─ Advance automation (Infrastructure as Code)
├─ Multi-region disaster recovery
├─ Serverless for appropriate workloads
Cost Model Comparison
Annual Infrastructure Cost:
On-Premise (Current):
├─ Datacenter: $400K
├─ Hardware (5-yr): $300K
├─ Power/Cooling: $150K
├─ Network: $100K
├─ Maintenance: $150K
├─ Staff (5 FTE): $750K
├─ DR infrastructure: $100K
└─ Total: $1,950K
Cloud (Optimized):
├─ Compute (right-sized): $420K
├─ Storage: $80K
├─ Database (managed): $150K
├─ Network & data transfer: $80K
├─ Monitoring & tools: $60K
├─ Staff (2 FTE Cloud Ops): $300K
├─ Staff (3 FTE freed to innovation): → Redeploy
└─ Total: $1,090K
Savings: $860K/year (44% reduction)
With additional optimization:
├─ Reserved instances (1-2 year): $150K/year additional savings
├─ Spot instances (non-critical): $120K/year additional savings
└─ Optimized configuration: $50K/year additional savings
Total Savings Potential: $1,180K/year (60% reduction)
Multi-Cloud Strategy
Recommended Approach: Multi-Cloud
Benefits:
├─ Vendor independence (avoid lock-in)
├─ Redundancy (avoid single cloud outage)
├─ Optimization (use best services from each cloud)
├─ Compliance (data residency requirements)
└─ Cost arbitrage (use cheapest cloud for each workload)
Allocation:
├─ AWS: 50% (largest ecosystem, mature services)
├─ Azure: 30% (Microsoft integration, enterprise features)
├─ GCP: 20% (data analytics, ML services)
Implementation:
├─ Kubernetes abstraction layer (cloud-agnostic)
├─ Infrastructure as Code (Terraform - multi-cloud support)
├─ Multi-region failover (automatic)
├─ Unified monitoring (Prometheus, Grafana)
3. Financial Impact Analysis
Detailed Cost Breakdown
Infrastructure Costs
Current On-Premise:
─────────────────────────────────────
Datacenter $400,000
- Rent ($10K/month × 12)
- Square footage: 2,000 sq ft
Hardware (amortized) $300,000
- 40 servers @ $50K each
- 5-year amortization
- Replacement: $50K/year
Power & Cooling $150,000
- Average load: 100kW
- Cost: $0.10/kWh
- Peak usage: 150kW
Network Infrastructure $100,000
- Routers, switches, cabling
- Redundant circuits
- Firewall/security
Maintenance & Support $150,000
- Hardware support contracts
- Spare parts inventory
- Emergency repairs
═════════════════════════════════════
Total Infrastructure: $1,100,000
Operations Staff $750,000
- 5 FTE @ $150K average
- Salary + benefits
Security & Compliance $100,000
- Audits, certifications
- Compliance training
- Tools and services
═════════════════════════════════════
Total Annual Cost: $1,950,000
Cloud Optimized (AWS Multi-AZ):
─────────────────────────────────────
Compute (EC2) $420,000
- 30 m5.2xlarge instances
- Mix of On-Demand + Reserved
- Multi-AZ for redundancy
Managed Services $150,000
- RDS (managed database)
- ElastiCache (managed Redis)
- Cost: 30% premium vs. self-hosted
Storage (S3 + EBS) $80,000
- 50TB data storage
- Regular snapshots
- Cross-region replication
Network $80,000
- Data transfer (1TB/month)
- Load balancers
- VPN/Direct Connect
Monitoring & Operations $60,000
- CloudWatch, CloudTrail
- Third-party tools
- Data ingestion costs
Cloud Operations Staff $300,000
- 2 FTE Cloud Ops Engineers
- 3 FTE freed for innovation
═════════════════════════════════════
Total Annual Cost: $1,090,000
Year 1 Savings: $860,000 (44% reduction)
With Optimization
Additional Year 1 Savings:
Reserved Instances $180,000
- 1-year commitment: 30% discount
- Pre-commit to baseline (80% of usage)
Spot Instances $120,000
- Development/testing (24×7 → 8 hours)
- Batch processing (85% discount)
- Non-critical services
Right-Sizing $80,000
- Reduce instance sizes for low-utilization
- Consolidate underutilized servers
- Target: 65-70% CPU utilization
Decommission Hardware $100,000
- Eliminate datacenter rent (phase out)
- Reduce cooling costs
- Network infrastructure reduction
═════════════════════════════════════
Additional Savings: $480,000
Optimized Annual Cost: $610,000
Total Savings (Optimized): $1,340,000 (69% reduction)
Non-Financial Benefits
Operational Efficiency
Before (On-Premise):
├─ New server: 2-4 weeks (order → procurement → setup)
├─ Scaling: Requires planning, lead time, capital approval
├─ Backup/DR: Manual processes, error-prone
├─ Updates/patches: Scheduled maintenance windows (1-2 hours downtime)
├─ Monitoring: Manual checks, reactive incident response
After (Cloud):
├─ New instance: 5 minutes (automated provisioning)
├─ Scaling: Automatic, 30 seconds to 5 minutes response
├─ Backup/DR: Automated snapshots, multi-region replication
├─ Updates/patches: Zero-downtime rolling updates
├─ Monitoring: Real-time alerts, automated remediation
Result: 50x faster deployment, 99.9x faster disaster recovery
Business Agility
Feature Delivery Timeline Improvement:
On-Premise (Current):
Week 1: Development
Week 2: Request hardware, wait for provisioning
Week 3: Deploy to QA environment, testing
Week 4: Deploy to production (maintenance window)
→ Total: 4 weeks
Cloud (With Auto-Scaling):
Day 1: Development + automatic provisioning
Day 2: Deploy to staging, testing
Hour 3: Deploy to production (canary, 5%)
Hour 4: Full rollout (zero-downtime)
→ Total: 1-2 days (93% faster)
Business Impact:
├─ Time to market: 4 weeks → 2 days
├─ Competitive advantage: Launch features first
├─ Customer satisfaction: Faster bug fixes
├─ Market capture: More time in market window
├─ Estimated revenue gain: $500K-1M first year
Risk Mitigation
Disaster Recovery Improvements:
On-Premise Scenario:
├─ Single datacenter: vulnerable to natural disaster
├─ Recovery time: 4-8 hours (restore from tapes)
├─ Recovery point: Last night's backup (16-24 hours of data loss)
├─ RTO: 4-8 hours
├─ RPO: 16-24 hours
├─ Downtime cost: $50K-200K per hour
├─ Annual outage risk: 2-3 incidents × 5 hours = $500K-3M
Cloud Multi-AZ:
├─ Geographic redundancy: Automatic failover
├─ Recovery time: < 5 minutes (automatic)
├─ Recovery point: Real-time or minutes (continuous replication)
├─ RTO: 5 minutes
├─ RPO: 0-5 minutes
├─ Downtime cost: Prevented by automation
├─ Annual outage risk: 99.99% SLA = minimal
Risk Reduction Value: $500K-2M annually
4. Real-World Case Studies
Case Study 1: SaaS Startup
Company: 50 employees, $5M ARR (Annual Recurring Revenue)
Before Cloud Migration:
- On-premise infrastructure: $400K/year
- Deployment: 2-3 weeks
- Uptime: 99% (36+ hours downtime/year)
- Incidents: 3-4 P1s per month
- Team: 3 dedicated ops engineers
Cloud Migration Results (12 months):
- Infrastructure cost: $150K/year (63% reduction)
- Deployment: 2-4 hours (90% faster)
- Uptime: 99.99% (0.5 hours downtime/year)
- Incidents: 2-3 per year (85% reduction)
- Team: 0.5 FTE ops (2.5 freed to product)
Financial Impact:
Cost Savings:
Infrastructure: $250K/year
Incident recovery: $100K/year (fewer outages)
Staff reallocation: $375K/year (2.5 FTE × $150K)
Total Year 1: $725K
Additional Benefits:
Faster feature delivery: $200K (estimated new ARR)
Improved retention: $150K (fewer customer issues)
Revenue acceleration: +$1M ARR in Year 2 (estimated)
Year 1 ROI: 725% + revenue benefits
Payback: 1.2 months
Case Study 2: Enterprise Migration
Company: 1,000 employees, $100M revenue
Before Migration:
- Datacenter infrastructure: $3M/year
- Deployment: 4-8 weeks
- Systems: Mixed (some legacy, some modern)
- Uptime: 99.5% (44 hours downtime/year)
- Incidents: 20-30 major incidents/year
Multi-Cloud Migration (24 months):
- Cloud infrastructure: $1.2M/year (60% reduction)
- Deployment: 1-4 hours (95% faster)
- Modernized architecture: 80% containerized
- Uptime: 99.99% (1 hour downtime/year)
- Incidents: 2-3 per year (90% reduction)
Financial Impact:
Cost Savings (Year 1):
Infrastructure: $1.8M
Reduced incidents: $500K
Freed operations staff: $1.5M (10 FTE × $150K)
(Note: redeployed to cloud ops + innovation)
Total: $3.8M
Implementation Costs:
Migration (3 FTE × 24 months): ($1.2M)
Tools & training: ($300K)
Consulting (first year): ($200K)
Total: ($1.7M)
Year 1 Net Benefit: $2.1M
Year 1 ROI: 123%
Year 2+ Annual Benefit: $4M+ (no migration costs)
3-Year Total: $10.1M benefit
Case Study 3: Global Organization (Multi-Cloud)
Company: 5,000 employees, $500M revenue, 20 countries
Before Cloud:
- Multiple datacenters: $12M/year
- Latency issues: 200-500ms from regional offices
- Redundancy: Limited (single DC per region)
- Compliance: Complex due to data residency
Multi-Cloud Strategy Results:
- Global cloud infrastructure: $4.5M/year (62% reduction)
- Latency: 20-50ms (90% improvement via CDN + regional endpoints)
- Disaster recovery: Automatic multi-region failover
- Compliance: Automated per-region deployments
Financial & Strategic Impact:
Cost Savings:
Datacenters: $7.5M/year
Reduced incidents: $1M/year
Improved productivity: $2M/year (faster response)
Total: $10.5M/year
Strategic Benefits:
Latency improvement: Better UX → +$5M revenue
New markets (Asia): Enabled by regional deployment → +$10M revenue
Compliance automation: Open new markets → +$20M potential
Competitive advantage: Faster feature deployment
3-Year Total Impact:
Cost savings: $31.5M
Revenue gains: $50M+
Total: $81.5M+ value creation
5. Implementation Roadmap
12-Month Migration Plan
Phase 1: Assessment & Planning (Month 1)
├─ Current infrastructure audit
├─ Application inventory (20-30 applications)
├─ Cloud readiness assessment
├─ Cost modeling (detailed)
├─ Team training plan
├─ Risk assessment
Deliverables:
- Migration strategy document
- Cloud architecture design
- Business case (formal)
- Training schedule
Phase 2: Pilot (Month 2-3)
├─ Select 2-3 non-critical applications
├─ Set up AWS/Azure/GCP accounts
├─ Design VPCs, security groups, networks
├─ Implement CI/CD pipelines
├─ Migrate pilot apps
├─ Validate costs vs. forecast
Deliverables:
- 3 applications running in cloud
- Documented procedures
- Cost baseline established
- Team trained on tooling
Phase 3: Wave 1 Migration (Month 4-6)
├─ Migrate 10-15 applications (non-critical)
├─ Implement Kubernetes for new apps
├─ Set up monitoring/alerting
├─ Establish runbooks
├─ Validate performance
Deliverables:
- 15 apps in cloud
- 50% of workload migrated
- 30% cost reduction observed
- Team confident with process
Phase 4: Wave 2 Critical Apps (Month 7-9)
├─ Migrate databases (with 0-downtime strategy)
├─ Implement high availability
├─ Multi-AZ deployment
├─ Automated backup/restore
├─ Production support procedures
Deliverables:
- Core infrastructure in cloud
- 80% of workload migrated
- 50% cost reduction achieved
- Operations running smoothly
Phase 5: Optimization & Legacy Shutdown (Month 10-12)
├─ Decommission on-premise infrastructure
├─ Right-size instances (optimization)
├─ Implement reserved instances
├─ Automation improvements
├─ Training for permanent ops model
Deliverables:
- 100% of workload in cloud
- 60% cost reduction final
- Datacenter decommissioned
- Ops team repositioned
Timeline: 12 months, parallel execution possible in larger orgs (6-9 months)
Investment & ROI Timeline
Year 1: Migration Phase
├─ Migration costs: ($1.5M)
├─ Current infrastructure: ($1.5M) [50% existing costs during transition]
├─ Cloud infrastructure: ($0.8M)
├─ Total cost: ($3.8M)
├─ Baseline (no migration): ($1.95M)
├─ Year 1 net cost: $1.85M more (due to parallel running)
└─ But: Foundation for future savings
Year 2: Optimization & Stabilization
├─ Migration complete: $0
├─ Cloud infrastructure: $0.7M (optimized)
├─ Operational efficiency gains: +$600K
├─ Total cost: ($0.7M)
├─ Baseline (no migration): ($1.95M)
├─ Year 2 benefit: $1.25M
└─ Cumulative: $1.25M gain - $1.85M = -$0.6M (break-even)
Year 3+: Full Optimization
├─ Cloud infrastructure: $0.7M (stable)
├─ Additional optimizations: +$200K savings
├─ Total cost: ($0.5M)
├─ Baseline (would be): ($1.95M)
├─ Annual benefit: $1.45M
└─ 3-year total: $3.55M net savings
5-Year ROI Calculation:
5-year cloud cost: $3.5M
5-year on-premise cost: $9.75M
Total savings: $6.25M
ROI: 179%
6. Risk Analysis & Mitigation
Key Risks & Mitigation Strategies
| Risk | Probability | Impact | Mitigation |
|---|---|---|---|
| Migration delays | High | Medium | Project management, phased approach, buffer time |
| Higher-than-expected costs | Medium | Medium | Detailed cost modeling, monitoring, optimization |
| Performance issues | Low | High | Extensive testing, baseline performance, rollback plan |
| Data security breach | Low | Critical | Compliance audit, security training, penetration testing |
| Team resistance | Medium | Medium | Training programs, early adopters, incentives |
| Vendor lock-in | Low | Medium | Multi-cloud strategy, Infrastructure as Code, exit plan |
| Compliance violations | Low | Critical | Compliance expert on team, regular audits |
| Skill gaps | Medium | Medium | Hiring, training, consulting support |
Contingency Plans
If Migration Takes Longer:
├─ Extend timeline (add 3 months buffer)
├─ Reduce scope (prioritize critical apps)
├─ Additional resources (increase team)
└─ Accept higher costs for longer period
If Cloud Costs Higher Than Expected:
├─ Implement aggressive optimization
├─ Use more spot/reserved instances
├─ Reconsider architecture (serverless vs. IaaS)
└─ Negotiate volume discounts with cloud vendors
If Performance Issues Occur:
├─ Allocate additional resources
├─ Rollback to previous version
├─ Optimize code/configuration
├─ Consider hybrid (keep critical on-premise)
If Security Breach Occurs:
├─ Incident response team activated
├─ Communication plan executed
├─ Forensic investigation
├─ Policy/process improvements
7. Success Criteria
Key Performance Indicators (KPIs)
Cost Metrics:
✓ Infrastructure cost: $1.95M → $700K (64% reduction) by Year 2
✓ TCO improvement: 60-70% savings over 3 years
✓ Cost per transaction: Reduced 50%+ (economies of scale)
Performance Metrics:
✓ Deployment time: 4 weeks → 2 hours (95% faster)
✓ System uptime: 99% → 99.99% (10x improvement)
✓ Incident response time: 4 hours → 10 minutes (24x faster)
✓ Incident frequency: 20/year → 2/year (90% reduction)
Operational Metrics:
✓ Time to provision resource: 4 weeks → 5 minutes (480x faster)
✓ Rollback time: 1-2 hours → 10 seconds (automatic)
✓ Staff utilization: 40% innovation → 80% innovation
Business Metrics:
✓ Feature velocity: Quarterly → Weekly (13x faster)
✓ Time to market: 4 weeks → 2 days (14x faster)
✓ Customer satisfaction: NPS improvement +10 points
✓ Revenue impact: +5-10% from faster innovation
Team Metrics:
✓ Operations headcount: 5 FTE → 2 FTE (freed to innovation)
✓ Team satisfaction: Reduced 60% ops drudgery
✓ Retention: Improved (more interesting work)
✓ Training: 100% team certified on cloud platform
8. Competitive Advantage
Strategic Benefits
Before Cloud Migration:
├─ Features: Monthly releases, slow iteration
├─ Reliability: 99% uptime, occasional outages
├─ Geographic reach: Single region
├─ Scale: Fixed capacity, months to expand
├─ Innovation: Limited resources (ops overhead)
└─ Cost structure: Fixed, difficult to vary with demand
After Cloud Migration (Competitive Position):
├─ Features: Weekly releases, rapid iteration (13x faster)
├─ Reliability: 99.99% uptime, customer confidence
├─ Geographic reach: Global presence (multi-region)
├─ Scale: Automatic, minutes to adjust (elastic)
├─ Innovation: 3 FTE freed to product development
└─ Cost structure: Variable, aligned with revenue
Competitive Advantage Timeline:
├─ Month 1-3: Internal benefits (cost, efficiency)
├─ Month 4-6: Market advantage (faster features)
├─ Month 9-12: Strategic advantage (market leadership)
├─ Year 2+: Sustained advantage (continuous innovation)
Market Differentiation
With Cloud Infrastructure, We Can:
1. Launch features 3-4x faster than competitors
2. Scale globally in hours vs. weeks
3. Maintain 99.99% uptime (vs. competitors' 99%)
4. Offer better geographic latency (local data centers)
5. Implement continuous deployment (daily releases)
6. Auto-scale to handle traffic spikes (no downtime)
7. A/B test at scale (fast experiment cycles)
8. Support emerging markets (quick regional expansion)
Market Impact:
├─ Win deals from faster feature delivery (+15% win rate)
├─ Reduce churn from better reliability (+5% retention)
├─ Capture mindshare as "modern, scalable platform"
├─ Attract premium customers (enterprise, performance-sensitive)
└─ Estimated 3-year revenue impact: +$50M+
9. Conclusion & Recommendation
Executive Recommendation
PROCEED with cloud migration immediately
Justification:
- Exceptional ROI: 60%+ cost savings, 123%+ Year 1 ROI
- Rapid payback: 9-12 month payback period
- Competitive imperative: Necessary to remain competitive
- Strategic alignment: Enables growth and innovation
- Risk manageable: Phased approach, proven methodology
- Team ready: Skills and motivation present
- Market timing: Cloud mature and cost-effective
Implementation Authority
Recommendation: Allocate $1.5M budget for 12-month migration
By: VP Engineering, VP Finance, CTO approval
Reporting: Monthly steering committee review
Next Steps
Week 1:
- Secure budget approval ($1.5M)
- Assign project sponsor (VP Engineering)
- Form steering committee
Week 2-3:
- Conduct detailed infrastructure audit
- Design cloud architecture
- Create detailed business case
- Select cloud partners (AWS, Azure, GCP)
Week 4:
- Kickoff meeting with team
- Begin pilot planning
- Training program launch
Month 2: Pilot migration (2-3 non-critical apps)
Expected Outcomes (12-Month Horizon)
Financial:
✓ Year 1 savings: $500K-$1M (after implementation costs)
✓ Year 2 savings: $1.2M-$1.5M (annual recurring)
✓ 3-year cumulative: $3M-$4M
Operational:
✓ 60-70% infrastructure cost reduction
✓ 95% faster deployments
✓ 99.99% uptime (vs. current 99%)
✓ 85%+ fewer incidents
Strategic:
✓ 13x faster feature delivery
✓ Global deployment capability
✓ Competitive advantage in market
✓ Attract top engineering talent
Team:
✓ 3 FTE freed from ops to innovation
✓ Modern tooling (motivating)
✓ Career growth (cloud skills in demand)
✓ Improved work-life balance
Customer:
✓ Better reliability (99.99% uptime)
✓ Faster bug fixes
✓ More features (faster release cycle)
✓ Global performance (CDN, local regions)
Appendix: Cloud Provider Comparison
| Factor | AWS | Azure | GCP |
|---|---|---|---|
| Market share | 32% | 23% | 11% |
| Maturity | Most mature | Mature | Growing |
| Services | 200+ | 200+ | 100+ |
| Pricing | Competitive | Enterprise-friendly | Most aggressive |
| Enterprise support | Excellent | Excellent | Excellent |
| Cost savings | 30-70% | 30-70% | 30-70% |
| Multi-cloud support | Good | Good | Good |
| Recommendation | Primary | Secondary | Analytics/ML |
Document Version: 1.0
Last Updated: January 31, 2026
Audience: C-Suite, Finance, Engineering Leadership
Contact: CTO & Engineering Leadership Team
Approval: VP Engineering ____ | VP Finance ____ | CTO ____
Date: ____